Skip to content

Who it is for

Four roles, the same project file

The same model of an installation looks different from a ladder, different from a designer’s desk, and different again to somebody selling a flat with the smart home already in it. Here is what each of the four takes from it.

Roles

Four reasons to open the same project

Electrician and contractor

What usually wins the job is who quotes first.

  • Leave the client with a drawing and a figure the same day instead of coming back in a fortnight
  • Cable length comes from the route on the plan, so you order what will actually go in rather than what a rate of thumb produced
  • The board is laid out to the nearest module before you drive out for the enclosure
  • Price per mounting point or per labour hour, on your own rates

Installation designer

Documentation stops being four files you have to keep in step.

  • Technical description, circuit table and single-line diagram all come from the same model
  • A change to a circuit travels through every document at once, with no hunting for where else that number lived
  • Every circuit carries the reason behind its cross-section, so you check a decision instead of redoing the arithmetic
  • The drawing exports to DWG and DXF, so further work in your own CAD stays open

Architect and developer

The client asks about smart home in the meeting, not a fortnight after it.

  • The system reads architectural and electrical designs, so you start from a file you already have
  • Price electrical equipment and smart home devices straight from the design and give the figure on the spot
  • Design a repeatable apartment type once and copy it, instead of redrawing each one
  • Compare finish standards as variants, because cost comes from the same model

Building your own home

You do not need to draw to know what you want.

  • Plan sockets and lighting room by room, on your own floor plan
  • See what the equipment and devices cost before it shows up in a contractor’s offer
  • Your electrician gets something concrete instead of a sketch on a napkin, so you discuss the installation rather than guesswork
  • The project stays with you, including exactly where every cable went

Common ground

What all four roles get

What differs is why somebody came. The model of the installation is one.

  • A plan to scale, with rooms and floor areas recognised
  • Electrical points in PN-EN 60617 symbols
  • Circuits with cross-sections and protection to PN-HD 60364
  • A board laid out by module and a single-line diagram
  • An estimate and a full documentation pack in one PDF

Not on this list?

Sign up and pick what you do. The scope of the first release follows whoever turns up.